Serving the Mid-Altantic Region Since 1959 717-653-6789   |   Contact Us
I.K. Stoltzfus Service Corp.



Recent Projects & News

Back to the Project Gallery



Wednesday, February 1, 2006 Water Blasting

Stadium - Deteriorating Concrete Removed

  • The deteriorating concrete on the steps of this University stadium needed removed so that the seats could be resurfaced.
  • 40,000 psi water jetting equipment was used
  • This was a very difficult project due to the cold temperatures (near freezi






  • Back to the Project Gallery



    ©2017 I.K. Stoltzfus Service Corp.   All right reserved.   |   Website by infinet design